Burke Station Road Sidewalk and Storm Drainage Improvements

  • Scope: This project includes the design and construction of curb, gutter and sidewalk on the west side of Burke Station Road between Main Street and Stoughton Road. This is a drainage and pedestrian improvements project.
  • Spring 2016 construction anticipated
Burke Station Rd

Chain Bridge Rd at Rust Curve Sidewalk Improvements (Proposed)


  • Scope: This is a proposed project to construct a new, continuous pedestrian facility on the west side of Chain Bridge Road between Old Town Fairfax and Rust Hill Place.
 
 Gordon Residence Before 033015 reduced

CUE Transit Development Plan

  • Scope: The planningprocess of the CUE Transit Development Plan provides opportunity to review/update transit goals & objectives, to assess current transit services, to identify unmet transit needs or issues and finally, to determine appropriate course of action over six year planning horizon.
CUE 150812 - 05 CityHall

Fairfax Blvd at Chain Bridge Rd Intersection (Northfax)

  • Scope: Provide road improvements on Chain Bridge Road (Route 123) from Route 29/50 (Fairfax Boulevard) to Eaton Place. Widen Chain Bridge Road (Route 123) to six lanes from Route 29/50 (Fairfax Boulevard) to Eaton Place. Improve the geometrics (lane alignments) of the roadway approaches for the intersection of Route 29/50 (Fairfax Boulevard) at Chain Bridge Road (Route 123). Improve pedestrian accommodations at all legs of the intersection. Make extensive culvert improvements to eliminate roadway flooding caused by the inadequate culvert under Route 123.
  • Summer 2016 construction anticipated; construction will last approximately 2 years
Northfax Intersection

Fairfax Blvd/Draper Drive Traffic Signal

  • Scope:This project will reconstruct the traffic signal at Draper Drive/Fairfax Boulevard by replacing the existing span-wire signal with a mast arm signal.
  • Spring 2016 construction anticipated
Fairfax Blvd/Draper Traffic Signal

Government Center Pkwy Extension

  • Scope: This project will construct the missing link of Government Center Pkwy from Stevenson St to Jermantown Rd. Provide two eastbound thru Lanes to provide right and left turn lanes to Jermantown Road, as well as turn lanes to Stevenson St and the shopping center.
Government Center Pkwy Extension

Kamp Washington Intersection Improvements

  • Scope:Eliminate substandard horizontal geometry along Fairfax Boulevard/Main Street through the main intersection. Install signalization phasing changes to optimize operation at the Kamp Washington Intersection. Provide an additional southbound lane on U.S. Route 29 from Kamp Washington Intersection to the existing third southbound lane near Shell Station. Extend westbound through lanes on Main Street from Chestnut Street to Hallman Street.Lengthen turn lanes to provide additional storage for turning vehicles. Improve pedestrian mobility with new crosswalks, curb ramps, sidewalks, and pedestrian signalization. Replace span-wire signals with mast arm signals.
  • Construction estimated to be complete in 2017
Kamp Washington

Multimodal Transportation Plan

  • Scope:The City is completing the multimodal transportation plan, which will identify a transportation vision for the City and identify goals and strategies for implementation over the next 15-20 years.
Multimodal Plan

Old Lee Highway "Great Street" Conceptual Plan

  • Scope: The City recently completed a conceptual plan for Old Lee Highway between North Street and Fairfax Circle in the City of Fairfax.
  • More Information:Project Webpage
OldLee-Highway-Homepage-Banner2

Roberts Road Sidewalk Improvements

  • Scope:This project includes the design and construction of curb, gutter and sidewalk on the west side of Burke Station Road between Main Street and Stoughton Road. This is a drainage and pedestrian improvements project.
  • Spring 2016 construction anticipated
Roberts Rd

Stream Restoration Project Along an Unnamed Tributary of the Accotink Creek

  • Scope:

Phase 1 - Approximately 600 linear feet of full restoration of the downstream section from the Chain Bridge Rd. bridge west along the Rustfield and Taba Cove neighborhood property lines.

Phase 2 -Approximately 1,300 linear feet of full restoration upstream from Phase I, west behind the residential homes located along Springmann Dr. and Center St., to Keith Ave.

University Dr Extension (Proposed)

 

  • Scope: This project will construct an extension of University Dr from Lee Hwy to Eaton Place. Provide one northbound and one southbound lanes, including right and left turn lanesonto Lee Hwy and Eaton Pl.
University Dr Extension

University Drive Road Diet


  • Scope: The proposed project would modify the configuration of the roadway to provide three travel lanes (one lane in each direction plus a two-way center turn left turn lane), and bicycle lanes on both sides of the roadway instead of four lanes (two lanes in each direction).