Jermantown Road Phase II Improvements

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Jermantown Rd Ph II

Project Description:

  • Provide a third westbound lane on Fairfax Boulevard from Bevan Drive to Jermantown Road. 
  • Widen northbound Jermantown Road to allow for two through lanes adjacent to the left turn lane into the Giant shopping center entrance. 
  • Geometric improvements to southbound Jermantown Road to provide a dual right turn lane, through lane, and left turn lane. 
  • Replace span-wire signals with mast arm signals at both Fairfax Boulevard/Jermantown Road and Fairfax Boulevard/Bevan Drive.

Benefits of the Improvements:

  • Reduce overall congestion experienced within the project. 
  • Additional westbound lane will decrease PM traffic congestion for westbound U.S. Route 50. 
  • Additional southbound right turn lane will decrease PM traffic congestion for southbound Jermantown Road. 
  • Improve mobility on northbound Jermantown Road in the vicinity of the intersection with Fairfax Boulevard.

Project Schedule:

  • This project has been successfully completed.

Project Plans:

Documents for Download:

Construction Photos:

August 2015   IMG_0048  IMG_0053
 20150729_135602_resized  20150608_113533_resized