City of Fairfax, VA
Home MenuProgram Application Information
For questions about the FRHC program please call 703-385-2494
To Make an Application Submission to the FRHC:
DROP OFF SUBMISSION:
Application and fee can be dropped off at the Community Development and Planning Office located in room 207A of City Hall. You can also use one of the drop box locations listed below:
- Drop Box Locations (please ensure envelopes are labeled for FRHC/Attn Tina Gillian):
- In the City Hall circular driveway facing Armstrong Street.
- At the Atrium entrance - facing George Mason Boulevard.
MAIL-IN SUBMISSION:
- An application and fee can be mailed to FRHC, P.O. Box 3178, Fairfax, Virginia 22038. Please click here to email tina.gillian@fairfaxva.gov or call 703-385-2494 to notify the FRHC that you have mailed the application.
BY APPOINTMENT:
- To request an appointment please click here to email tina.gillian@fairfaxva.gov; or
- Call 703-385-2494.
Download Program Brochure (contains FRHC and Bank Guidelines):
Click here to access the Brochure ($10,000 TO $350,000)
Download Program Application:
Click here to access the Application ($10,000 TO $350,000)
FRHC Meetings:
The FRHC meets on the second Tuesday of each month. Meetings are not usually held during the months of August or December, however, meetings may be scheduled during these months if a schedule change is deemed necessary by the Board of Directors.
Applications are reviewed on a first come, first served, basis contingent upon availability of funds.
MEETING DATE (SUBJECT TO CHANGE) |
APPLICATION DEADLINE |
---|---|
JULY 9, 2024 | JUNE 14, 2024 |
AUGUST 7, 2024 | N/A |
SEPTEMBER 10, 2024 | AUGUST 16, 2024 |
OCTOBER 15, 2024 **Date Change** | SEPTEMBER 13, 2024 |
NOVEMBER 12, 2024 | OCTOBER 18, 2024 |
NO MEETING IN DECEMBER | N/A |
JANUARY 14, 2025 | DECEMBER 20, 2024 |
FEBRUARY 11, 2025 | JANUARY 17, 2025 |
MARCH 11, 2025 | FEBRUARY 14, 2025 |
APRIL 8, 2025 | MARCH 14, 2025 |
MAY 13, 2025 | APRIL 18, 2025 |
JUNE 10, 2025 | MAY 16, 2025 |
MEETING DATE / |
LOCATION | AGENDAS | MEETING MINUTES |
---|---|---|---|
November 14, 2023 / 11 a.m. |
MainStreet Bank 10089 Fairfax Blvd 3rd Floor Conf. Room |
Agenda | Minutes |
January 9, 2024 / 11 a.m. |
MainStreet Bank 10089 Fairfax Blvd 3rd Floor Conf. Room |
Agenda | Minutes |
February 13, 2024 / 11 a.m. |
MainStreet Bank 10089 Fairfax Blvd 3rd Floor Conf. Room |
Agenda | Minutes |
March 12, 2024 / 11 a.m. |
MainStreet Bank 10089 Fairfax Blvd 3rd Floor Conf. Room |
Agenda | Minutes |
April 9, 2024 / 11 a.m. |
MainStreet Bank 10089 Fairfax Blvd 3rd Floor Conf. Room |
Agenda | Minutes |
May 14, 2024 / 11 a.m. |
MainStreet Bank 10089 Fairfax Blvd 3rd Floor Conf. Room |
Agenda | Minutes |
June 11, 2024 / 11 a.m. |
MainStreet Bank 10089 Fairfax Blvd 3rd Floor Conf. Room |
Agenda | Minutes |
July 9, 2024 / 11 a.m. |
MainStreet Bank 10089 Fairfax Blvd 3rd Floor Conf. Room |
||
August 7, 2024 / 11:30 a.m. |
PJ Skidoos 9908 Fairfax Blvd |
Agenda | |
September 10, 2024 / 11 a.m. |
MainStreet Bank 10089 Fairfax Blvd 3rd Floor Conf. Room |
Agenda | |
October 15, 2024 / 11 a.m. |
MainStreet Bank 10089 Fairfax Blvd 3rd Floor Conf. Room |
Agenda | |
November 12, 2024 / 11 a.m. |
MainStreet Bank 10089 Fairfax Blvd 3rd Floor Conf. Room |
Agenda |
Loan Program Summary:
In conjunction with MainStreet Bank, the FRHC will make available home improvement loans up to $350,000.00 with no interest paid by the borrower for the first two years. Interest on this loan will be paid by the FRHC during the 24-month term. At the end of the initial two-year term, the homeowner may pay off the loan or apply to refinance into a conventional mortgage or home equity line of credit.
The loan approval process is two-fold. Project applications are first reviewed by the FRHC. Once approved, applicants will be referred to MainStreet Bank to begin the bank loan approval process. At this time the applicant will need to provide the bank with all appropriate financial information and project plans requested by the bank representative.
Applications are not fully approved until the loan closing takes place with MainStreet Bank. If work is started before the loan closes, your application may be denied.
Additional Loan Program Notes:
Home Tour on Meeting Date:
On the day of the meeting, the FRHC will review the application and conduct a tour of the home to discuss the project with the homeowner. The homeowner will need to be present at the home on the meeting date.
Quarterly Status Updates and FRHC Sign:
During the twenty-four (24) month term of the 0% interest loan, program participants must provide the FRHC with quarterly project status reports.
During the renovation process the FRHC and MainStreet Bank have the right to post a sign in the front yard of the property and to inspect the project property at any time.
=====================================================
Did you find this page by using a link on the Office of Code Administration Construction Permits page? Click here to return to the Construction Permits webpage.
=====================================================